|
|
|
|
|
Company goals. |
|
Staff. |
|
Services. |
|
Projects & clientele. |
|
|
|
|
|
|
Our main objective is to provide the Client with
high quality, dependable service, at a reasonable cost, achieved through a
solid professional staff, for a quick response and solid service. |
|
|
|
We consider our Clients as our partners within
our company, that’s why we emphasize Customer Satisfaction as our number
one priority. |
|
|
|
This Philosophy has enabled us to achieve the
actual position on this market, as a dependable Contractor. |
|
|
|
|
|
|
|
We currently employ 87 employees covering
different disciplines. Additional labor force can be obtained through Local
Union contracts as it would be required. |
|
|
|
GENERAL MANAGER |
|
Ing Agustin Jim Pung. |
|
ADMINISTRATIVE MANAGER: |
|
Lic. Norma Muñoz. |
|
ADMINISTRATIVE STAFF: |
|
CP. Laura Salazar |
|
Karina Martinez |
|
ACCOUNTANT: |
|
CP. Javier Castillo. |
|
|
|
|
|
PURCHASING: |
|
Lic. Genovevo Morales. |
|
FIELD ENGINEERS: |
|
Ing. Leonardo Ponce. Ing. Sergio Muñoz. Adrian Porras |
|
SUPERVISORS: |
|
Juan Sanchez. Martin Olivares. Carlos
Wong. |
|
Florencio Gallegos Leonel Santiago. Carlos
Gonzalez. |
|
Antonio Caballero Edgar Aguilar |
|
ENGINEERING: |
|
Arq. Martin Gerardo Gonzalez. Ing.
Higinio Benavides |
|
Ing. Alfonso Zolezzi Josemario Lara. |
|
SUPPORT PERSONNEL |
|
(48) Electricians. (20) Electrical
Helpers. (2) Crane Operators. |
|
(2) Warehouse Keepers (28) Union Construction
Work force. |
|
|
|
|
|
|
PROJECT ENGINEERS: |
|
Ing. Victor Moctezuma. Ing. Hipolito Zuñiga. |
|
SUPERVISORS: |
|
Carlos Gonzalez. Tomas Hernandez
Efrain Salazar |
|
SUPPORT PERSONNEL: |
|
(80) Union Electricians. |
|
(38) Union Electrical Helpers. |
|
(4)
Warehouse Keeper. |
|
|
|
|
|
|
|
|
POWER & ELECTRICAL. |
|
Power & Distribution Substations. |
|
Transmission Lines. |
|
Power & Distribution Systems. |
|
Relaying & Protection Systems. |
|
Lighting Systems. |
|
Grounding & Lightning Protection. |
|
Industrial Cranes & Conveyors. |
|
Generators, Uninterruptible Power &
Emergency Backup Systems. |
|
Motor-generator Installation. |
|
Computer
Equipment Installation. |
|
Paging
& Telephone Systems. |
|
Hazardous area electrical installation & design. |
|
|
|
|
|
|
|
|
INSTRUMENTATION & CONTROL. |
|
Boilers & Furnace. |
|
Assembly and Painting Robots. |
|
Moving Assembly lines & Paint Lines. |
|
Molding Machines. |
|
Security Systems, Alarms, Closed Circuit . |
|
Automated Production Lines. |
|
Programmable Logic Controllers. |
|
Pressure, Flow, Temperature, Weight, PH and
Conductivity Control. |
|
Distributed Control Systems. |
|
Data acquisition Systems. |
|
Energy Management Systems. |
|
|
|
|
|
|
|
|
|
MAINTENANCE. |
|
Safety Audits. |
|
Code compliance Audits. |
|
Energy Audits. |
|
Short Circuit Analysis. |
|
Protection Coordination Studies. |
|
Grounding System Analysis. |
|
Transformer Testing. |
|
High Voltage Testing of Cable & Equipment. |
|
Protection Relay Testing. |
|
Testing & Repair of power switches. |
|
General Maintenance of Substations & Power
Systems. |
|
Thermograph Studies on Electrical Equipment. |
|
Oil Testing of electrical equipment. |
|
Troubleshooting in General. |
|
|
|
|
|
|
|
|
|
MAQUILADORAS. |
|
Ametek Lamb Electric Division. (Reynosa, Tamps). |
|
Breed Mexicana S.A. de C.V. (Valle Hermoso, Tamps.) |
|
Delphi-Componentes Mecanicos de Matamoros. |
|
Controles Reynosa S.A. de C.V. (Johnson
Controls) |
|
Candados Universales S.A. (Matamoros, Tamps.) |
|
Condura (Eaton Corp. Matamoros, Tamps.) |
|
Controlam (Eaton Corp. Matamoros, Tamps.) |
|
Delphi Deltronicos de Matamoros S.A. |
|
Delphi-Rimir S.A. (Matamoros, Tamps.) |
|
Delnosa S.A. (Reynosa, Tamps.) |
|
Allied Signal
(Valle Hermoso, Tamps.) |
|
HAI de Mexico S.A. (Matamoros, Tamps.) |
|
Impresora DONECO S.A. (Reynosa, Tamps.) |
|
Lucent Techonologies de Mexico S.A. de C.V.
(Reynosa & Matamoros) |
|
Magnetek de Matamoros S.A. |
|
|
|
|
|
|
|
Magnetek Componentes Electricos S.A. (Matamoros,
Tamps) |
|
Maquiladora General de Matamoros. |
|
Productos Electromecanicos BAC. (Matamoros,
Tamps) |
|
Ventramex S.A. (Queretaro, Qro.) |
|
Tejidos de Valle Hermoso (Fruit of the Loom). |
|
United Technologies. (Matamoros, Tamps.) |
|
General Motors de Ramos Arizpe, Coah. (Ramos
Arizpe Coah.) |
|
Sociedad de Motores de Reynosa y Monterrey. (GE) |
|
MINSA (Ramos Arizpe Coah.) |
|
Quimica Fluor S.A. (Matamoros, Tamps.) |
|
TRW (Reynosa, Tamps.) |
|
General Electric (Monterrey, N.L.) |
|
Celestica (Monterrey, N.L.) |
|
KIMCO (Reynosa, Tamps.) |
|
|
|
|
|
|
|
|
|
DELPHI-RIMIR (Matamoros, Tamps.) |
|
Design & Build. |
|
New Power Distribution System (2-3750KVA, 4-2250 KVA).Project Cost:
$1.3 MM U.S. Dlls. |
|
GENERAL MOTORS –TKS (Saltillo Coah.) |
|
New Paint Plant. |
|
Power Distribution System. (8-2500KVA) |
|
Project Cost: $3.2 MM U.S. Dlls. |
|
Paint System Power & Control. |
|
Project Cost: $1.5 MM U.S. Dlls. |
|
GENERAL MOTORS –RONO (Saltillo Coah.) |
|
New Stamping Plant. Design & Build. |
|
Power Distribution System. (4-2500KVA) |
|
Project Cost: $1.2 MM U.S. Dlls. |
|
|
|
|
|
|
|
GENERAL MOTORS –Morrison Knudsen (Saltillo Coah.) |
|
New Transmision Plant. Complete Facility. |
|
Equipment Power & Control. |
|
Project Cost: $1.8 MM U.S. Dlls. |
|
GENERAL ELECTRIC –Transportation (Monterrey,
N.L.) |
|
New Transportation Motor Plant. |
|
Design & Build, Complete Facility |
|
Building & Machinery installation. |
|
Project Cost: $1.6 MM U.S. Dlls. |
|
FREZENIUS MEDICAL –(Reynosa, Tamps.) |
|
New Manufacturing Plant. Complete Facility |
|
Design & Build & Machinery installation. |
|
Project Cost: $1.1 MM U.S. Dlls.) |
|
|
|
|
|
|
|
|
|
LUCENT TECHNOLGIES (Reynosa, Tamps.) |
|
New Repair Facility. Design & Build, Complete Facility. |
|
Project Cost: $1.2 MM U.S. Dlls.) |
|
TRW (Reynosa, Tamps.) |
|
New Manufacturing Facility, Design & Build, Complete Facility. |
|
Project Cost: $0.9 MM U.S. Dlls.) |
|
KIMCO (Reynosa, Tamps.) |
|
New Manufacturing Facility, Design & Build, Complete Facility. |
|
Project Cost: $0.7 MM U.S. Dlls.) |
|
CELESTICA (Monterrey, N.L. Tamps.) |
|
New Manufacturing Facility, Design & Build, Complete Facility. |
|
Project Cost: $0.85 MM U.S. Dlls.) |
|
|
|
|
|
|
|
|
|
MAGNETEK (Reynosa, Tamps.) |
|
New Manufacturing Facility, Design & Build, Complete Facility. |
|
Project Cost: $0.8 MM U.S. Dlls.) |
|
WESTERN RESERVE (Matamoros, Tamps.) |
|
New Manufacturing Facility, Design & Build, Complete Facility. |
|
Project Cost: $0.7 MM U.S. Dlls.) |
|
|
|
|
|
|
|
|
|
|
|
GUIDE Lighting (Monterrey. N.L.) |
|
New Manufacturing Facility, Design & Build, Complete Facility. |
|
Project Cost: $1.2 MM U.S. Dlls.) |
|
Norton Company (Reynosa, Tamps.) |
|
Renovation of Burned down facility Equipment
installation. |
|
Webbing Machines, Impregnating Ovens “Hazardous
Location Installation”. Schotz-Meiser, Eisenman. |
|
Project Cost: $0.5 MM U.S. Dlls.) |
|